|
|
|
INSTALLATION OF A WIND TURBINE 200 |
| A
Wind Turbine 200 unit was installed at Senati headquarters, as part of the
equipments which supply energy to an ecological cabin.
This project developed by SENATI consists on the
implementation of a
cabin entirely powered by renewable energy equipments as a wind
turbine, solar PV panels and a solar heater.
The installation was done by students of SENATI under supervision of Mr Perales, teacher from SENATI. Some views of the activities: |
|
|
|
Painting blades and tail vane |
|
|
|
Parts of the 12m ( 39 feet ) tower |
|
|
|
Views of the rotor after the static balancing |
|
|
|
Going to the installation place |
|
|
|
Transporting rotor and permanent magnet generator already assembled |
|
|
|
Gin pole installed |
|
|
|
Views of the tower base |
|
|
Students from SENATI assembling the tower |
|
|
Preparation of turnbuckle with double eye |
|
|
Power cable being installed through the tower |
|
|
Power cable through the tower base, notice the "U" pipe for the cable which avoids the entrance of any kind of objects and moisture, at the right Mr. Perales supervising. |
|
|
Rotor and PMG being assembled to the base |
|
|
Electric connections being prepared |
|
|
Erection of the wind turbine |
|
|
Wind Turbine 200 flying |
|
© 2011 DENERTEC S.A.C. All rights reserved |