TRAINING COURSE ON THE CONSTRUCTION OF THE "WIND GENERATOR 200" |
| On
July of 2003 took place a training course on the construction of the
"WIND GENERATOR 200", the participants were teachers of
SENATI, a training center for industrial workers. The first part of the course was theoretical and subjects as wind potential measurement, wind energy applications and issues related with wind turbines design were treated. The second part took place on Febraury of 2004, as part of the activities within the course, an installation of one unit of the Wind Generator 200 was done. This installation is located at SENATI Villa El Salvador. Some shots of the activities during the course: |
|
|
|
Assembly of blades to the Permanent Magnet Generator |
|
|
|
Assembling the aternator. |
|
|
|
Electrical connection of the wind turbine to the conductor that goes down through the pipe tower to the rectifier |
|
|
|
Final adjustments before erection |
|
|
|
Erection of wind turbine |
|
|
|
Wind Generator installed |
|
|
|
Working on the electronic control. Inside the box, the rectifier is at left and the electronic control is at right. |
|